PAMUKOVA ELEKTRİK ÜRETİM A.Ş.

Pamukova, founded in 2015, operates in renewable energy industry. Verusa Holding has 49% stake of Pamukova while Verusaturk has 51% stake of the company which has TL 95,000,000,000 paid-in-capital.

 

Pamukova holds 19.50% stake of Enda Enerji Holding A.S. which has  TL 300, 000,000 paid-in-capital.  Enda Enerji Holding is a major player in electricity generation from renewable resources in Turkey and its total installed capacity of 182,55 MW is based on 102.5 MW installed capacity of 4 hydroelectric, 7.5 MW installed capacity of 1 geothermal and 73 MW installed capacity of 5 wind power plants. 

 

Pamukova also holds 100% stake in Tortum Elektrik Uretim A.S. which has a 7.49 MW installed capacity hydroelectric power generation plant in Erzurum Province and TL 43,000,000 TL paid-in-capital.

Pamukova recently purchased 80% stake of Bomonti Elektrik Uretim A.S. which has a 7.49 MW installed capacity hydroelectric power generation plant in Adıyaman Province and 17,000,000 TL paid-in-capital.

 

www.pamukovaelektrik.com.tr

 

Pamukova